Another A2 on the road to recovery….yes, another one!

An update is due…..so after all the suspension work, I replaced the timing belt and pump, replaced the clutch and today it went through the mot. The mot guy was really impressed with the amount of work I’d done on it😀
The clutch, although working ok was a bit stiff, and I suspected it was the original…..it was, although it still had a fair bit to go. As it’s for a friend I want it to go with no hidden horrors for the future.
So it’s done! I shall soon be driving it to wales for its new adventure.
My plan is to try to keep it maintained in the future and keep an eye on things, so I really hope it provides reliable transport.
 

Attachments

  • IMG_6109.jpeg
    IMG_6109.jpeg
    2.7 MB · Views: 30
  • IMG_6093.jpeg
    IMG_6093.jpeg
    3.9 MB · Views: 28
  • IMG_6090.jpeg
    IMG_6090.jpeg
    3 MB · Views: 25
  • IMG_5509.jpeg
    IMG_5509.jpeg
    2.2 MB · Views: 24
Back
Top